NPV Problem on my new 10bII Brian wrote: I am facing problem with the calculation of NPV on my new 10bII. For example to calculate NPV of the following cash flows: - -240,000 + 200,000 / 1.08 + 100,000 / (1.08)2 + 20,000 / (1.08)3 I should get and did get the answer +46796 when I used the calculator. But yesterday I noticed the calculation was wrong and I got 76,960.65 instead. These were what I keyed in:- Shift c all 240000 (+ / -) CFj 200,000 CFj 100,000 CFj 20,000 CFj 8 I / YR Shift NPV Answer I got is 76,960.65 which is wrong. Previously when I did the above calculation following the same process, I got the correct answer. I think there is something wrong. When I checked this against the slower method of working out each discounted rate for each cash flow, I got the correct answer 46796. Why? --- Answer: Hi Brian, You need to set the P / YR to 1. The default is 12. 1 Shift P / Yr Shift c all "Screen should display 1" 240000 (+ / -) CFj 200,000 CFj 100,000 CFj 20,000 CFj 8 I / YR Shift NPV "Screen should display 46,795.71" Here is a primer to setting up your HP 10bII.
|